000 | 01899naa a2200277 i 4500 | ||
---|---|---|---|
005 | 20250313062534.0 | ||
008 | 211119s2018 ny ad||gr|||| 001 0aeng d | ||
020 | _a9781119287537 | ||
040 |
_aUISEK-EC _bspa _erda |
||
082 | 0 | 4 |
_a690.068 _bS121b 2018 |
100 | 1 |
_aSacks, Rafael _911672 _eaut |
|
245 | 1 | 0 |
_aBIM Handbook: _bA Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers / _cRafael Sacks; Charles Eastman ; Ghang Lee ; Paul Teicholz |
250 | _aTercera edición | ||
264 | 1 |
_aNew York: _bWiley ; _c2018 |
|
300 |
_a659 páginas: _bIlustraciones, gráficas; _c25 cm |
||
336 | _atxt | ||
337 |
_2rdamedia _an |
||
338 |
_2rdacarrier _anc |
||
504 | _aIncluye índice y bibliografía | ||
505 | 2 | _a1. Introduction. 2. Core technologies and Software. 3. Collaboration and interoperability. 4. BIM for owners and facility managers. 5. BIM architects and engineers. 6. BIM for contractors. 7. BIM for subcontractors and fabricators. 8. Facilitators of BIM adoption and implementation. 9. The future: building with BIM. 10. BIM cases studies. Introduction. Acknowledgments. National Children's Hospital, Dublin. Hyundai Motorstudio Goyang, South Korea. Fondation Louis Vuitton, Paris. Dongdaemun Design Plaza, Seoul, South Korea. Saint Joseph Hospital, Denver. Victoria Station, London Undergrouind. Nanyang Technological Iniversity Student Residence Halls, Singapore. Mapletree Business City II, Singapore. Pince Mohammad Bin Abdulazis International Aiport, Medina, UAE. Howard Hughes Medical Institute, Chevy Chase, Maryland. Stanford Neuroscience Health Center, Palo Alto, California. | |
526 | _aArquitectura / Maestría en Gerencia de Proyectos BIM | ||
647 | 1 | 7 |
_aConstrucción _2lemb _915784 |
650 | 2 | 7 |
_911673 _aManual de construcción _2lemb |
653 | 2 | 6 | _aGráficos de computadora |
942 | _cBK | ||
999 |
_c15037 _d15037 |